Evidence that supports the claim, and no more
Assurance in Cogna8 is built from evidence, not attestation. Each control climbs from declared to effective only as the record supports it, and exceptions surface with an owner.
Assurance overview
How far each control is proven. Effective only after a passed test.
Assurance level by framework
Number of controls at or above each levelEvidence collected
Last 12 weeksExceptions
3 open- HighOR-15 test failed, 2 payments approved above threshold without a recorded approver
- MediumOR-07 overdue, Azure OpenAI provider review past due date
- MediumUnowned asset, gpt-4o caller in Finance has no accountable owner
Evidence sources
| Cogna8 decision receipts | Live | 1,204 |
| CI/CD change records | Live | 86 |
| Model evaluation results | Weekly import | 42 |
| Third-party assurance reports | Uploaded | 7 |
Six levels, each with a test
| Level | What it means |
|---|---|
| Declared | A control exists on paper and has an owner. |
| Observed | Cogna8 can see it in configuration or behaviour. |
| Implemented | The mechanism is in place, for example an active gate policy. |
| Evidenced | Dated records show it operating, such as decision receipts. |
| Tested | A test of the control has run and its result is recorded. |
| Effective | A passed test supports the claim. Never inferred without one. |
Use the tools you already run
Cogna8 does not try to replace your testing, monitoring or red-team tools. Their results attach to the AI systems and controls they cover, alongside Cogna8's own receipts.
- Decision receipts and change records collected automatically
- Evaluation and monitoring results imported from existing tools
- Third-party assurance reports attached to vendors and models
- Audit packs built from live evidence, not screenshots
Audit packs, assembled
The copilot builds the quarterly audit pack: it collects evidence, links decision receipts, finds gaps and failed tests, and drafts evidence requests and exceptions for approval.
CPS 230 audit pack, Q3 2026
1 July to 30 September 2026. Draft, 82% complete.
- Collected evidence for 41 controls, July to September
- Linked 1,204 decision receipts to OR-15
- Found 4 gaps and 1 failed test
- Send 3 evidence requests to owners
- Draft the exceptions summary for the committee
Email and task to the control owner, due 10 Oct.
Opens an exception owned by the Claims Ops Lead.
Let's connect
Tell us where your AI programme is today. We start with a short, scoped pilot on your own AI estate, and every enquiry is handled in confidence.